
Works description:
– creating of a new water supply network of 2.7 Km length, in PEID Dn 125 – 450 mm, of which 1200m by directional drilling, along which 5 drinking water pots and 10 decorative fountains were installed.
– replacement of 300 m of steel water pipe, Dn 400 mm, with a ductile iron pipe, in the municipal gallery
