Starting this year, we are diversifying our activity  with irrigation works.

Together with our associate, we will execute two irrigation contracts in Dobrogea region.

  1.    Execution of the works for the investment objectives managed by ANIF within the National Program for Rehabilitation of the Main Irrigation Infrastructure in Romania – stage I “- Lot 4 -” Rehabilitation of Sinoe irrigation development “, Constanta county.    The work consists of the rehabilitation of the Sinoe pumping station with a flow of 41,040 cm / h and the construction of the irrigation channels CA Sinoe and CA 4 Sinoe.
    2.   Execution of the works for the investment objectives managed by ANIF, within the National Program for Rehabilitation of the Main Irrigation Infrastructure in Romania – stage I “- Lot 3-” Rehabilitation of the Babadag irrigation development “, Tulcea County.   The work consists of the rehabilitation of the SP1 pumping stations with a flow rate of 40,320 cm / h and of the SRP1 pumping station with a flow  of 32,832 cm / h, as well as the reconstruction of the irrigation pipelines and channels for taking and transporting the water from Babadag Lake (CA0, CA1 and CA4)

Fără categorie

Leave a Reply

Your email address will not be published. Required fields are marked *